🚀 Just launchedApple UI design taste for AI agents — create polished UIs using Apple’s design style.Try it now

Enterprise style guide

A complete style guide inspired by the enterprise design language. Use it with Windframe AI to generate pages, sections, and components for your own project that follow these same design principles, or start from one of the templates below and customize it in the editor.

2 pages10 sections
Generate Your Own Designor start from a template below
Export To
HTML logoHTMLReact logoReactNext.js logoNext.jsVue logoVueNuxt logoNuxtAngular logoAngularSvelteAstro logoAstroSolidJS logoSolidJSRails logoRails

Design System

The Enterprise design language

Refined enterprise UI with restrained neutrals, precise hierarchy, and product-first surfaces. The interface chrome stays minimal so workflows, dashboards, and operational content remain the visual focus.

Neutral-first UI chromeRoobert typography rhythmWorkflow canvas focusCrisp light/dark parity

Typography

Aa

Roobert TRIAL

font-normal tracking-[-0.01em]

The quick brown fox

Design is not how it looks. Design is how it works.

Small body copy, clear and readable

Quiet neutral chromeLight/dark structural parityDashboard-first composition

Spacing

Concrete 8px spacing system

8px micro-grid for controls plus 24-40px section spacing to keep dense UIs readable

Border Radius

Structured 6-10px radius

rounded-md to rounded-lg

Colors

Design palette

Canvas

App background

Light
Dark

Primary Text

Headings / key UI text

Light
Dark

Muted Text

Secondary labels / nav

Light
Dark

Panel

Cards / control surfaces

Light
Dark

Border

Dividers / field boundaries

Light
Dark

More pronounced swatches for quick light/dark comparison.

Shadows

Subtle neutral shadows on major surfaces; mostly border-led hierarchy for controls and containers

Enterprise in practice

Polished designs inspired by the best design systems

Companies like Linear, Notion, and Vercel invest heavily in their design systems. Windframe studies those systems and bakes their principles into styles you can use out of the box, so your project gets the same level of polish. These are some example images of UIs generated with this style.

Every component, every page: consistent by design. Browse all Enterprise templates →

AI Playground

Build something new with the Enterprise style

Describe any UI and Windframe generates it using the same Enterprise design tokens shown above. Your output stays consistent with every template on this page.

Enterprise style10+ frameworks

Try an example:

Pre-built components and pages

Browse 12 production-ready templates built with Enterprise design principles. Preview any template, export the code to your framework, or open it in the visual editor to customize.

Project DashboardProject Dashboard
page

Project Dashboard

Dashboard

Automation App landing pageAutomation App landing page
page

Automation App landing page

Full Page

Table with filters and action buttonsTable with filters and action buttons
section

Table with filters and action buttons

table

Hero 1Hero 1
section

Hero 1

Hero

Logo 1Logo 1
section

Logo 1

Logo

Content 1Content 1
section

Content 1

Contents

Features 1Features 1
section

Features 1

Features

How it Works Content SectionHow it Works Content Section
section

How it Works Content Section

Contents

Uses Cases Content SectionUses Cases Content Section
section

Uses Cases Content Section

Contents

Open source content sectionOpen source content section
section

Open source content section

Contents

CTA SectionCTA Section
section

CTA Section

CTA

Footer SectionFooter Section
section

Footer Section

Footer

Windframe

You have seen what a design style in Windframe can do. Now see everything Windframe can do.

Windframe brings the full workflow into one platform: generate with AI, edit visually, test responsiveness, reuse templates, and export clean code to your framework. It is built to help teams ship polished UI faster, from first prompt to production.

Windframe user avatarWindframe user avatarWindframe user avatar18,000+ developers
1,000+ templates10+ frameworks

AI generation with real design systems

Describe any component and get polished, production-ready Tailwind CSS that follows actual design rules, not generic output.

Visual drag-and-drop editor

Fine-tune any component without touching code. Move elements, adjust spacing, swap colors, all visually in real time.

Live preview at every breakpoint

See exactly how your UI looks on mobile, tablet, and desktop before you ship a single line.

Export to 10+ frameworks

React, Next.js, Vue, Nuxt, Svelte, Angular, HTML and more. Clean Tailwind code ready to drop straight into your project.

1,000+ ready-made templates

Browse polished pages, sections, and components across multiple styles. Use them as-is or as a starting point.

Multiple beautiful styles

Linear precision, Notion clarity, Apple polish, Stripe structure, Vercel precision and more. Each is a complete design system, not just a color swap.